3rd Street SW Road Rehabilitation Project - Update

Share 3rd Street SW Road Rehabilitation Project - Update on Facebook Share 3rd Street SW Road Rehabilitation Project - Update on Twitter Share 3rd Street SW Road Rehabilitation Project - Update on Linkedin Email 3rd Street SW Road Rehabilitation Project - Update link

Phase 1 construction of the Project has been completed; the section of road between 2nd Ave NW and 3rd St NW intersection and 1A Ave SW and 3rd St SW intersection including the CN rail crossing is now open to traffic. Work completed in Phase 1 included:

  • Waterline replacement and looping.
  • Partial concrete work.
  • Temporary asphalt capping over the trench extension.

Phase 2 work is expected to begin in Spring 2023 and will include the full asphalt replacement between 6 Ave SW and 2nd Ave NW along with the remaining portion of concrete work along the east side of the 3rd St SW.

We thank everyone for their cooperation during the construction!


Phase 1 construction of the Project has been completed; the section of road between 2nd Ave NW and 3rd St NW intersection and 1A Ave SW and 3rd St SW intersection including the CN rail crossing is now open to traffic. Work completed in Phase 1 included:

  • Waterline replacement and looping.
  • Partial concrete work.
  • Temporary asphalt capping over the trench extension.

Phase 2 work is expected to begin in Spring 2023 and will include the full asphalt replacement between 6 Ave SW and 2nd Ave NW along with the remaining portion of concrete work along the east side of the 3rd St SW.

We thank everyone for their cooperation during the construction!