Raw Water Transmission Line and Pump Station

Share Raw Water Transmission Line and Pump Station on Facebook Share Raw Water Transmission Line and Pump Station on Twitter Share Raw Water Transmission Line and Pump Station on Linkedin Email Raw Water Transmission Line and Pump Station link

In September 2018 construction was completed on the new Raw Water Line and Intake Pump Station. Construction included the installation of a Raw Water Line and Intake Pump Station to bring raw water from the lake adjacent to the Widewater Community Centre to the Town of Slave Lake Water Treatment Plant. The purpose of this project was to provide the Town of Slave Lake and area with an alternate stable supply of fresh water in the event that the current water intake at the mouth of the Slave River becomes compromised.

In September 2018 construction was completed on the new Raw Water Line and Intake Pump Station. Construction included the installation of a Raw Water Line and Intake Pump Station to bring raw water from the lake adjacent to the Widewater Community Centre to the Town of Slave Lake Water Treatment Plant. The purpose of this project was to provide the Town of Slave Lake and area with an alternate stable supply of fresh water in the event that the current water intake at the mouth of the Slave River becomes compromised.